← All insights Licensing

Factory Licence in Kuala Langat and Kuala Selangor (2026)? MPKL and MPKS Industrial Premise Licences for Telok Panglima Garang, Jenjarom, Banting, Puncak Alam and Bestari Jaya — Land Category, Planning Permission, Selangor's Unapproved-Factory (KTK) Programme, Temporary Licences and the 2027 Renewal

·12 min read

Telok Panglima Garang, Jenjarom and Banting in Kuala Langat, and Ijok, Bestari Jaya and Puncak Alam in Kuala Selangor, are where many Chinese and other foreign manufacturers look first when Klang and Shah Alam get too expensive. Land and rent are cheaper, and the ports are close. The catch is that both districts have a long history of factories built without approval. A factory licence there depends less on the application form and more on whether the land and the building were ever approved for industry. This guide explains who issues the licence, what the council checks, how Selangor's unapproved-factory (KTK) programme works, and what changes for the 2027 licence year.

Quick answer (as at November 2026): A factory in Kuala Langat (Banting, Telok Panglima Garang, Jenjarom, Tanjung Sepat, Morib) is licensed by Majlis Perbandaran Kuala Langat (MPKL). A factory in Kuala Selangor (Kuala Selangor town, Tanjung Karang, Ijok, Bestari Jaya, Puncak Alam) is licensed by Majlis Perbandaran Kuala Selangor (MPKS). Pulau Indah and Port Klang are MBDK, not MPKL. Both councils license under ss.102 and 107 of the Local Government Act 1976. A factory licence normally needs industrial land use, planning permission and a CCC or CF for the building. Without them you are in Selangor's KTK compliance programme (2025–2027), not a normal licence. For 2027, MPKS licences must be renewed before 31 December 2026, and MPKL charges 20% extra from 1 January 2027. Selangor plans two-year licences from January 2027 for businesses with clean records.

Aerial view of an industrial area of the kind found in Telok Panglima Garang and Kuala Langat, Selangor
Kuala Langat and Kuala Selangor offer cheaper industrial space than Klang, but the approval history of each lot varies widely.

Which council licenses your factory?

Selangor has twelve local authorities, and a factory licence comes from the one whose area the premises sits in. That is not always the council in the postal address. The quickest check is the assessment bill (cukai taksiran) for the lot: it names the council that collects the rate, which is also the council that licenses the business.

Kuala Langat vs Kuala Selangor: who licenses what (as at November 2026)
ItemMPKL (Kuala Langat)MPKS (Kuala Selangor)
Main industrial and business areasTelok Panglima Garang, Jenjarom, Banting, Tanjung Sepat, MoribIjok, Bestari Jaya, Puncak Alam, Kuala Selangor town, Tanjung Karang
Commonly confused withMBDK (Klang): Pulau Indah, Port Klang, Meru and Kapar are MBDKMBSA (Shah Alam) and MPS (Selayang) near the Puncak Alam and Ijok boundaries
Online channelse-Borang MPKL; the homepage also links the national MalaysiaBiz licence registration portalIP3KS for instant (non-risk) licences; eLesen or the integrated counter for composite (risk) licences
2027 renewal window3 November to 31 December 2026; 20% late charge from 1 January 2027Renew before 31 December 2026; MPKS warns enforcement can follow "without further notice"
Legal basisLocal Government Act 1976 s.102 (licensing by-laws) and s.107 (licences with conditions, revocable; up to three years under s.107(4)); each council's trade, business and industry licensing by-laws

Our factory and business licence service in Kuala Langat (MPKL) and the MPKS business licence application in Kuala Selangor each list the documents and steps for that council. The rest of this guide explains the land and building questions both councils ask before they issue anything.

What a factory licence actually depends on

A council licence is the last approval in the chain, not the first. A shop in a completed shophouse can be licensed in a few weeks because everything underneath it was approved when the building was built. A factory is different. Before the licensing department approves, other departments are asked to comment, and they check four things.

  1. Land category. Under the National Land Code, alienated land is categorised as agriculture, building or industry. A factory on land still categorised as agriculture needs a variation of conditions (s.124) through the district land office before it can be approved as an industrial use.
  2. Planning permission (Kebenaran Merancang, KM). The Town and Country Planning Act 1976 requires planning permission for development. Building on or changing the use of land without it is an offence. The Selangor state government uses this Act to act against unapproved factories.
  3. Building approval and occupation. Approved building plans, then a Certificate of Completion and Compliance (CCC), or a Certificate of Fitness (CF) for older buildings. Councils ask for a copy with the licence application.
  4. Technical agencies. Bomba for fire safety, the Department of Environment (DOE) for emissions and effluent, and, for some activities, the police or health department.
Check the lot before you sign the lease. Ask the landlord for the land title (showing category and express conditions), the KM letter, the approved building plan and the CCC or CF. If any one is missing, the licence application will stall at the technical review, and the rent keeps running. Our guide on buying or leasing industrial land in Malaysia covers the due diligence in detail.

How the application works: technical review, temporary licence, full licence

Neither MPKL nor MPKS publishes a factory-specific guideline that we could read online on 23 November 2026. Selangor councils do follow a common pattern, though. Subang Jaya's published guideline for industrial premises is a useful example. It puts factories in Category B, meaning licences that need technical comments from other departments.

How a Selangor council processes a factory licence: the MBSJ guideline as an example (check MPKL or MPKS for local rules)
StageWhat happensTypical outcome
ApplicationForm, IC or passport details, SSM documents, CF or CCC, tenancy agreement or title, location plan, floor sketch, photos from front, back, inside and side, and a DBP-checked signboard visualFile opened only if the checklist is complete
Technical meetingPresented at the licensing technical meeting within 14 working days; departments such as town planning, building, and DOE (for some activities) commentApprove, approve with conditions, or reject
Temporary licenceConsidered while other technical approvals are pending, such as renovation permits, ramp permits, wall partition approvals or internal sanitation6-month temporary licence
Full licenceGranted once all the council's conditions are met1-year licence (two years for eligible businesses from 2027; see below)
FeeSet by the council's by-law schedule according to floor area (for example up to or above 500 m²) and activity type: making or processing, wholesale or storage, or selling or servicesFee varies by council; we quote the actual MPKL or MPKS amount per case

General conditions are also attached to every industrial licence. Examples are a first-aid box, Bomba-approved fire extinguishers, adequate lighting and ventilation, clear fire exits, nothing stored on the five-foot way or drains, proper waste bins, and no other activity without the council's permission. Inspections check these, and so does the renewal. Our guide on fire extinguisher and Bomba fire certificate requirements explains the fire side.

Factory production floor inspected by the local council and Bomba before a factory licence is issued in Selangor
Council inspectors check the floor against the approved plan, the fire exits and the licensed activity.

Unapproved factories (KTK): the Selangor compliance programme

This is the part that makes Kuala Langat and Kuala Selangor different from Shah Alam or Subang Jaya. Over decades, many factories in both districts were built on agricultural lots or extended without planning approval. Selangor calls them kilang tanpa kebenaran (KTK), unapproved factories.

Selangor's unapproved-factory (KTK) programme: key facts
ItemDetailSource
Programme historyWhitening programme (pemutihan) started in 2006; success rate 2008–2013 was 38%State assembly written answer, April 2014
Relaxed technical rules"Minimum technical requirements" let existing on-site conditions count (for example existing car parks, canteen and plinth area), subject to Bomba support; planning permission is still required, and building plans follow KMSame answer, Appendix A
Current programmeProgram Pematuhan Syarat dan Penguatkuasaan KTK Selangor 2025–2027State assembly answer reported by Utusan, 21 April 2026
Scale4,170 KTK detected statewide (April 2026); 6,690 had been reported on 5,325 lots in November 2024Same report
Enforcement19 factories in Pulau Indah and Telok Gong that refused to comply received final notices and face demolition; enforcement uses the Town and Country Planning Act 1976, with prosecution and utility cut-offSame report
MPKL checklistMPKL's One Stop Centre lists a planning-permission checklist for the "Program Pemutihan Kilang Tanpa Kebenaran Negeri Selangor 2026"MPKL download list (the file could not be opened on 23 November 2026)

In practice there are three situations.

Kuala Langat has a history with the DOE. In 2018, illegal plastic recycling factories around Jenjarom were shut down after residents complained about burning and pollution. Since then, plastic, scrap and waste-processing activities in the district get closer DOE and council scrutiny. If your process emits smoke, odour or effluent, read our guide on DOE approval for factories in Malaysia before choosing the site.

Federal approvals that sit beside the council licence

The council licence lets you operate the premises. Separate federal approvals depend on the business, and the council may ask for some of them at the technical review.

The full sequence, with timings, is in our end-to-end factory setup guide for Malaysia.

Warehouse with forklifts and pallets that needs a council premise licence in Kuala Selangor or Kuala Langat
Warehouses and storage are licensed too. Council fees usually distinguish storage from manufacturing.

The 2027 renewal and Selangor's two-year licence

Most council licences in Selangor run on the calendar year, so the 2027 renewal window is open now.

On 16 November 2026, Selangor's local government EXCO, Dato' Ng Suee Lim, told Media Selangor that from January 2027, businesses with no problems, no blacklisting and a good record will get two-year licences instead of one. The policy was announced in the Selangor Budget 2027. It covers 122 business activities, including restaurants, grocery shops, mini markets, vehicle workshops and education institutions, subject to each council's eligibility rules. Businesses with frequent summonses may still get only one year. The announcement did not mention factories. Ask MPKL or MPKS whether your activity is on the list before paying for two years.

For renewals, use our Kuala Langat (MPKL) licence renewal or Kuala Selangor (MPKS) licence renewal service. If your factory has been extended, has changed activity or has outstanding compounds, sort those out before the window closes. Renewal is where they are checked.

Six mistakes we see in these two districts

  1. Leasing before checking the title. A lot can be cheap because it is still agricultural land or has no KM. The lease is signed, the renovation starts, and then the licence cannot be issued.
  2. Applying to the wrong council. A Pulau Indah address goes to MBDK, not MPKL. Near Puncak Alam, check the assessment bill.
  3. Extending without approval. A mezzanine, canopy or extra bay added without building approval turns an approved factory into a partly unapproved one. It surfaces at renewal.
  4. Treating a temporary licence as permanent. A 6-month or APTK-type licence has conditions with deadlines. Miss them and the licence lapses.
  5. Ignoring the DOE until after the licence. Councils may refer emitting activities to the DOE. Install a boiler or scrubber without the 30-day notification and you have a DOE problem as well as a council one.
  6. Missing the 31 December window. MPKL's 20% late charge is twice MPS Selayang's 10%. With 2027 renewals, there is no reason to pay it.
Industrial and agricultural land side by side in Selangor, where the land category decides whether a factory can be licensed
In Kuala Langat, industrial and agricultural lots often sit side by side. The title decides which is which.

Decision guide

Setting up in Telok Panglima Garang, Jenjarom or Puncak Alam? ONEKEY BIZ checks the title, KM and CCC before you sign. We then handle the MPKL factory licence application or the MPKS equivalent together with SSM, MIDA, DOE and work passes, so one team tracks every condition. Send us the lot address and we will tell you which council licenses it and what is missing.

Frequently asked questions

Which council issues a factory licence in Telok Panglima Garang or Jenjarom?

Majlis Perbandaran Kuala Langat (MPKL), which covers Banting, Telok Panglima Garang, Jenjarom, Tanjung Sepat and Morib. Pulau Indah and Port Klang are under MBDK (Klang), not MPKL. If unsure, check the assessment bill for the lot: the council that collects the rate is the one that licenses the business.

Can I get a factory licence on agricultural land in Kuala Langat or Kuala Selangor?

Not a normal licence. The land needs a variation of conditions to industrial use through the district land office (National Land Code s.124) and planning permission under the Town and Country Planning Act 1976. Factories already operating without approval fall under Selangor's KTK compliance and enforcement programme 2025–2027, where councils may issue temporary licences while approvals are pending. MPKS's APTK renewal form, for example, asks for the district land office special permit, CF, CCC or temporary building permit, and planning permission.

When must MPKL and MPKS licences be renewed for 2027?

MPKL accepts 2027 renewals from 3 November to 31 December 2026, with a 20% late charge from 1 January 2027. MPKS requires renewal before 31 December 2026: instant (non-risk) licences through IP3KS and composite (risk) licences at the integrated counter or eLesen.

Will Selangor business licences be valid for two years from 2027?

For many businesses, yes. Selangor's local government EXCO said on 16 November 2026 that from January 2027, businesses with no problems, no blacklisting and a good record will get two-year licences. The scheme covers 122 activities, including restaurants, grocery shops, mini markets, vehicle workshops and education institutions, subject to each council's eligibility rules. Factories were not mentioned, so confirm with MPKL or MPKS.

Does a foreign-owned factory need a MIDA licence as well as the council licence?

Only if it meets the Industrial Coordination Act 1975 thresholds: shareholders' funds of RM2.5 million or more, or 75 or more full-time paid employees. The council licence is needed regardless. Bomba, DOE and DOSH approvals depend on the building and the process.

Related services

We handle the process described in this article end-to-end.

Browse all 92 services →

This article is general information only, not legal, tax or immigration advice. Policies, thresholds and official fees are set by the relevant Malaysian authorities and may change. Talk to our consultants about your specific situation.

How ONEKEY BIZ can help

Need help navigating this in Malaysia?

Our Mandarin- and English-speaking consultants handle the whole process — fixed quotes, zero hidden fees.