Since 1 July 2024 a G2 to G7 contractor in Malaysia cannot renew its CIDB registration without a SCORE certificate, and since the star rating also decides whether the company can hold a government work certificate, a weak result can lock a contractor out of public tenders for a year. Yet most contractors meet SCORE for the first time as a seven-day online questionnaire with 50-odd questions and no explanation of how the answers become stars. This guide works through CIDB's own SCORE guidebook (version 2-2, dated 20 August 2025), the CIMS user manual and Circular 3/2024: the seven parameters, the 210 marks, the star bands and their hidden floors, which stars you actually need, the fees and timing, and what to fix before you press submit.
Quick answer (as at November 2026): CIDB SCORE marks a contractor on seven parameters worth 30 marks each, 210 in total. The percentage sets the rating: 0–10% no star, 11–30% one star, 31–50% two, 51–70% three, 71–84% four and 85–100% five. Four stars also needs at least 10 marks in every parameter, five stars at least 15. The application costs RM50 in CIMS, the certificate is valid for two years, and under CIDB Circular 3/2024 a G2–G7 contractor without one cannot renew its PPK. A new SPKK needs at least two stars for G2–G4 and three stars for G5–G7.
| Item | What CIDB's documents say |
|---|---|
| What SCORE is | Program Penilaian Keupayaan dan Kemampuan Kontraktor, a capability and capacity assessment built by CIDB with SME Corp |
| Who takes it | Contractors registered in grades G2 to G7. G1 contractors take a separate assessment, MCORE |
| Mandatory since | 1 July 2024 for G2–G7 PPK renewal (Circular 3/2024). G7 was already covered by the earlier Circular 1/2020 |
| Structure | 7 parameters × 30 marks = 210 marks |
| Fee | RM50 processing fee per application; RM300 for an appeal |
| Validity | 2 years from the certificate (CIMS user manual, SCORE module) |
| How often | One application in any 12 months; a fresh application only after 1 year from the result letter |
| Time to answer | 7 days from clicking Apply Now, or the system resets every answer |
| Result time | 24 hours to 14 working days, depending on grade and stars (see below) |
What SCORE is, and why it stopped being optional
SCORE started life as a voluntary benchmarking exercise. CIDB developed it with SME Corp to measure what a contractor can actually deliver, as opposed to what its grade says it may tender for. The guidebook lists four objectives: recognising capable contractors, finding performance gaps, building an industry profile that compares local and foreign contractors, and helping clients pick a contractor.
The shift from voluntary to compulsory came in two steps. CIDB first made SCORE a condition for G7 contractors, and then issued Surat Pekeliling CIDB Bil. 3/2024, which extended it to G2 through G6. The circular is short and blunt. Paragraph 4 says a G2–G7 contractor with a valid Perakuan Pendaftaran Kontraktor (PPK) must complete the SCORE assessment before renewing. Paragraph 7 says a contractor without a SCORE certificate is not eligible to renew. Paragraph 8 sets the start date at 1 July 2024, and paragraph 9 cancels Circular 1/2020.
So SCORE now sits alongside CCD points as a hard gate in every renewal. If you have not read how the two interact, our guide to CIDB renewal, CCD points and the 120-day window covers the rest of the renewal file.

The seven parameters and what each one asks
Every parameter carries the same weight. That is the single most useful fact about SCORE, because contractors tend to prepare the financial and project evidence carefully and leave procurement or management capability almost blank, even though each is worth exactly as much.
| Parameter (30 marks each) | What the questions cover | Typical evidence |
|---|---|---|
| 1. Business performance | Annual revenue, three-year revenue growth, how the company wins work, order book, customer feedback | Three years of revenue figures, list of ongoing projects, client feedback forms |
| 2. Financial capability | Six ratios: current ratio, gearing, gross profit margin, net profit margin, return on investment, return on equity | Latest audited financial statements |
| 3. Technical capability | CIDB-accredited personnel, professionally registered staff, company experience, productivity improvements | SKK, SSS, site supervisor, CCPM and QA/QC certificates; BEM, LAM, BQSM registrations; machinery purchase records |
| 4. Project management | Written SOPs, completion time, ICT use, risk management, QLASSIC, SHASSIC, green practices | Quality manual or project quality plan, CPCs against contract dates, HIRARC records, insurance policies |
| 5. Procurement management | Procurement policy, material and project cost accuracy, stock management, storage policy | Written purchasing policy, subcontractor selection records, stock cards or inventory system |
| 6. Best practices | Bookkeeping method, employee management, quality management, material and standards compliance, CSR or PROTEGE, awards | EPF registration, training plan, ISO 9001, 14001, 45001 or MS ISO 37001 certificates, lab test reports |
| 7. Management capability | Organisation chart, job descriptions, vision, management structure, IT use, innovation, R&D spending, staff training, code of ethics | Dated organisation chart, offer letters with job descriptions, annual training calendar, code of conduct |
A few details from the guidebook are worth knowing before you start.
- Revenue questions answer themselves. You enter revenue for the latest year, the year before and the year before that. The system then computes questions 1 and 2. For an application made in 2026 the latest year is 2025.
- Completion time is graded in four bands. Ahead of schedule, on time, late, or contract terminated. CIDB accepts certificates of practical completion, purchase orders and invoices as proof, measured against the date in the contract or letter of award.
- Risk management has a named benchmark. A "dedicated professional" means at least one Safety Officer holding a green book. A "dedicated unit" must be visible on the organisation chart.
- Question 20 is pre-filled. The system marks it from the specialisation codes already approved on your registration. If your codes are thin, the fix is a registration update, not a SCORE answer. See how CIDB specialisation codes work.
- Anti-bribery certification counts. MS ISO 37001 is listed among the standards under best practices, which matters to G7 contractors already working towards it for CIDB Circular 1/2026.
How 210 marks become stars
CIDB adds the seven parameter marks, converts the total to a percentage, and reads the rating off a table. Two of the bands carry a second condition that catches strong companies with one weak area.
| Overall percentage | Approximate marks out of 210 | Extra condition | Rating | CIDB's description |
|---|---|---|---|---|
| 0–10% | 0–21 | None | No star | Meets registration and basic operating requirements |
| 11–30% | about 23–63 | None | 1 star | Has basic management and technical capability |
| 31–50% | about 65–105 | None | 2 stars | Capable in management and technical capability |
| 51–70% | about 107–147 | None | 3 stars | Good management, technical capability, best practice and project management |
| 71–84% | about 149–177 | At least 10 marks in every parameter | 4 stars | Efficient, innovative, integrated systems; able to export services |
| 85–100% | about 179–210 | At least 15 marks in every parameter | 5 stars | Exemplary, strong company; active in international markets |
The mark ranges above are our arithmetic from CIDB's percentage bands; the guidebook publishes the percentages only. The four-star floor has applied since 1 January 2017. The guidebook's worked example says that a company scoring above 85% overall but with any one parameter below 15 marks does not keep five stars and is marked down. The same method applies to four stars and the 10-mark floor.
In practice the arithmetic is forgiving at the bottom and demanding at the top. Three stars needs roughly half the available marks, an average of about 15.3 per parameter, and a company can reach it with one parameter near zero. Four stars cannot be reached that way. A contractor averaging 24 in six parameters and scoring 8 in procurement has 152 marks, or 72%, and still misses four stars.

Which star rating do you actually need?
This is where published summaries, including some consultants' pages, blur two different certificates. CIDB's documents separate them.
| Purpose | SCORE requirement | Source |
|---|---|---|
| Renew PPK, G2–G7 | A SCORE certificate. The circular does not state a minimum number of stars | Circular 3/2024, paragraphs 4 and 7 |
| New SPKK, G2–G4 | Valid SCORE of at least 2 stars | SPKK registration conditions, paragraph 1.1(f); Circular 1/2026, Annex A |
| New SPKK, G5–G7 | Valid SCORE of at least 3 stars (G7 also needs ISO 9001 or CQMS) | Same |
| Renew SPKK, G7 | Valid SCORE certificate | SPKK registration conditions, paragraph 1.2(c) |
| Foreign contractor, renewal | Valid SCORE certificate when applying to re-register | CIDB conditions for foreign contractor registration, item 5 |
| SPKKA (foreign contractor's government work certificate) | Valid SCORE of 3 stars | SPKKA conditions, item 5 |
Read together, the position is this. To keep the PPK alive you need to have done SCORE. To tender for government work through the Sijil Perolehan Kerja Kerajaan (SPKK) you need a rating, and the bar depends on your grade. CIDB's standing terms of registration also reserve the right to require any contractor to undergo rating, so individual state offices may ask for more at renewal. Where a renewal officer quotes a star minimum for the PPK itself, ask which circular it comes from.
Private clients are a separate matter. Developers and main contractors may write a minimum SCORE rating into their own pre-qualification. That is a commercial condition, not a CIDB rule, so read the tender documents: a client can ask for more stars than CIDB does.
Applying in CIMS: the seven-day clock
The whole assessment runs inside the CIMS portal. You need a valid PPK and a CIMS login.
- Open the SCORE module from the CIMS dashboard and click Apply Now. If the company applied less than a year ago the button is replaced by View Application.
- Accept the contractor's declaration and enter the applicant's name, telephone number and position.
- Answer every question in all seven scopes within seven days of clicking Apply Now. After the deadline the system resets every answer that has been saved but not submitted.
- Upload supporting documents wherever an answer calls for one. An answer without its document is an unsupported declaration.
- Review. Incomplete questions are shown in red.
- Confirm and pay. Once submitted the assessment cannot be withdrawn or edited. The system issues a pro-forma invoice for the RM50 processing fee.
- Read the result under View Result & Certificate. The certificate carries a QR code that opens the virtual certificate, which can be printed free of charge.
The seven days are the reason to prepare outside the portal. Gather the documents, decide each answer, and only then click Apply Now. Starting the clock first and hunting for a completion certificate on day six is how contractors end up declaring things they cannot prove.
How long the result takes
The guidebook's process chart splits by grade and by outcome. Low ratings are confirmed by the system. Ratings that unlock something are checked by a person.
| Grade | Computed rating | What happens | Time |
|---|---|---|---|
| G2–G4 | 0–1 star | System confirms automatically; certificate can be printed | 24 hours |
| G2–G4 | 2 or 3 stars | Verification by a processing officer before the result is issued | 1–3 working days |
| G5–G7 | 0–2 stars | System confirms automatically | 24 hours |
| G5–G7 | 3 stars | Verification by a processing officer | 1–3 working days |
| Any | 4–5 stars | Audit session and decision by an assessment panel | 14 working days |
Notice the pattern. The ratings that satisfy the SPKK minimum for each grade group are exactly the ones a human reviews. A four- or five-star claim brings an audit, and an audited result has consequences for appeals, covered next.

Appeals, re-application and penalties for over-declaring
A disappointing result can be appealed, within limits the guidebook and manual set out.
- Appeal window: within one year of the original result letter.
- Appeal fee: RM300, charged since 1 April 2020.
- What you can change: you may upload additional documents against questions that carry documents. The original answers cannot be edited.
- When appeal is closed: the SCORE Appeal button is offered only for applications that did not go through audit. Where CIDB has carried out a site inspection or a contractor compliance check, the guidebook states the result is final.
- Fresh application: allowed only after one year from the date of the result letter.
CIDB can inspect your premises or site, or call the company in for a compliance review, to test what was declared. Circular 3/2024 adds that CIDB may run a Contractor Compliance Check at any time on a contractor that has completed SCORE and may cancel the certificate of one that fails it. The guidebook sets two tiers of sanction for declaring beyond actual capability: a warning letter with a three-month suspension from applying, or cancellation of the SCORE certificate with a one-year suspension.
Put the last item beside Circular 3/2024. A cancelled certificate plus a one-year bar means a G2–G7 contractor may reach its PPK expiry with no SCORE and no way to get one. An honest two stars is a far better position than a cancelled four.
Where contractors lose marks
From the questions CIDB asks, the same gaps recur.
- Work done but not documented. Completion time is scored from CPCs and letters of award. A project finished early with no certificate earns nothing.
- Accounts that are late or unaudited. Six ratios come straight from the financial statements. Thin equity or heavy hire-purchase debt pulls down gearing and return figures. Companies relying on audit exemption should read our note on statutory audit costs and timing in Malaysia before the SCORE year.
- No accredited people on the payroll. Technical capability rewards CIDB-accredited supervisors, site safety supervisors and construction project managers, and staff registered with professional boards. Borrowed names do not survive a compliance check.
- Policies that exist only in practice. Procurement, storage, risk management and the code of ethics are scored on written documents. A two-page purchasing policy and a dated organisation chart are cheap marks.
- Nothing under QLASSIC, SHASSIC or green practice. These sit inside project management. A contractor that has never had a project assessed scores nothing on those questions, which makes the 10-mark floor for four stars harder to clear.
- Training with no record. Management capability asks for a training schedule by employee with the number of course days. The same courses often earn CCD points, and taking part in a CIDB assessment programme such as SCORE is itself worth 15 CCD points under CIDB's registration procedures.
Foreign contractors and foreign-owned companies
SCORE applies to foreign contractors too. CIDB's conditions for foreign contractor registration require a valid SCORE certificate when applying to re-register, and the foreign contractor's government work certificate, SPKKA, requires three stars. A locally incorporated Sdn Bhd with foreign shareholders is assessed like any other G2–G7 contractor.
For a newly arrived group the difficulty is history. Parameter 1 wants three years of Malaysian revenue and parameter 3 wants local experience and accredited staff. A company in its first renewal cycle should expect a modest rating and plan the SPKK timeline around it. Our overview of CIDB registration for foreign contractors explains how grade, equity and personnel requirements fit together.
A practical plan
- Find your dates. PPK expiry, SPKK expiry, and the date of your last SCORE result letter.
- Fix the target. A certificate for PPK renewal; two stars for a G2–G4 SPKK; three for G5–G7 or SPKKA; more if a client demands it.
- Self-score on paper against the seven parameters, 30 marks each, before opening CIMS.
- Close the cheap gaps first: written policies, organisation chart, job descriptions, training calendar, client feedback forms.
- Then the slow ones: audited accounts, staff accreditation, ISO certification.
- Click Apply Now only when the file is complete, and finish inside seven days.
- Diarise the two-year expiry against the next renewal.
ONEKEY BIZ prepares the evidence file, maps it to the seven parameters and submits the CIDB SCORE rating application in CIMS, then lines the certificate up with your PPK and SPKK dates. If your renewal is already inside the 120-day window, tell us the expiry date first so the CIDB SCORE assessment and the renewal can be sequenced. For government tenders we handle the SPKK certificate alongside it. Contact us or WhatsApp +60 12-321 1349.
Frequently asked questions
How is CIDB SCORE calculated?
CIDB scores a contractor on seven parameters: business performance, financial capability, technical capability, project management, procurement management, best practices and management capability. Each carries 30 marks, 210 in total. The total is converted to a percentage: 0–10% no star, 11–30% one star, 31–50% two, 51–70% three, 71–84% four and 85–100% five. Four stars also requires at least 10 marks in every parameter and five stars at least 15.
Is CIDB SCORE compulsory for renewal?
Yes for grades G2 to G7. CIDB Circular 3/2024 requires these contractors to complete SCORE before renewing the PPK from 1 July 2024, and states that a contractor without a SCORE certificate is not eligible to renew. G1 contractors are assessed under MCORE instead. The circular does not set a minimum number of stars for PPK renewal; star minimums apply to the SPKK.
How many SCORE stars do I need for SPKK?
CIDB's SPKK conditions require a valid SCORE of at least two stars for G2, G3 and G4 contractors and at least three stars for G5, G6 and G7 when applying for a new SPKK. A G7 SPKK renewal needs a valid SCORE certificate, and a foreign contractor's SPKKA needs three stars.
How much does CIDB SCORE cost and how long is it valid?
The CIDB processing fee is RM50 per application, paid in CIMS, and an appeal costs RM300. The certificate is valid for two years. A contractor can apply only once in 12 months, and a fresh application is allowed only after one year from the result letter.
How long does a CIDB SCORE result take?
It depends on grade and rating. Low ratings (0–1 star for G2–G4, 0–2 stars for G5–G7) are confirmed by the system within 24 hours. Two- and three-star results for G2–G4 and three-star results for G5–G7 are verified by an officer in one to three working days. Four- and five-star results go to an audit session and assessment panel, which takes 14 working days. The questionnaire itself must be completed within seven days of clicking Apply Now.
Related services
We handle the process described in this article end-to-end.
- CIDB SCORE Contractor Capability RatingContractor capability & performance rating — required for SPKK and government tenders.
- CIDB Grade G1 Contractor RegistrationContractor registration for projects up to RM200,000.
- CIDB Grade G2 Contractor RegistrationContractor registration for projects up to RM500,000.
Sources & references
- CIDB — Panduan Program Penilaian Keupayaan & Kemampuan Kontraktor (SCORE) v.2-2, 20 August 2025
- CIDB CIMS — Manual Pengguna, Modul SCORE
- CIDB — Surat Pekeliling CIDB Bil. 3/2024: Pelaksanaan Penilaian SCORE-CIDB oleh Kontraktor G2 hingga G7
- CIDB — Syarat Pendaftaran Sijil Perolehan Kerja Kerajaan (SPKK)
- CIDB — Syarat Pendaftaran Kontraktor Asing dan SPKKA
- CIDB — Keperluan dan Prosedur Pendaftaran Kontraktor & Manual Pengguna
This article is general information only, not legal, tax or immigration advice. Policies, thresholds and official fees are set by the relevant Malaysian authorities and may change. Talk to our consultants about your specific situation.